Try your own assumptions on top of the study's power systems
The story follows the report. These tools let you go beyond it, without re-running the model.
Technology costs
Pick a cost level for each technology and see what it does to system costs and to the profitability gap, scenario by scenario.
PyPSA and cGrid compared
The study checked its main model, cGrid, with a second, open-source model built in PyPSA. How the two differ in method, and how their prices, capacities, generation and trade compare, as the report shows it.
Model inputs
What the open PyPSA model is given: what Denmark can build and at what cost, the 1991 weather and the demand hour by hour, flexibility, interconnectors and the fixed system around Denmark. Every value links to its line in the repository.
Model results
What the open PyPSA model returns: capacity and generation in all seven scenarios, the year hour by hour, prices, capture rates and trade. Compare scenarios and download the hours.